Skip to Content

Building your home with Housing Steel, step by step

From the first meeting to handing over the keys
November 11, 2026 by

Building a home is a big decision. So you know what to expect, here is how we work from the first contact to the handover.

1. In-person meeting

You book an in-person meeting and fill out a short questionnaire about your plot, the size and the service you are interested in. At the meeting we discuss your idea, your budget and your timeline.

2. Custom design

We design the home around your needs, the plot and the community's rules. The design is included in every service.

3. Quote and contract

Once the design is set, we prepare a custom quote based on the chosen service (shell or turnkey) and the finishes. If you use a mortgage, we align the stages with the bank's disbursements.

4. Documentation and permits

We prepare the documentation, the structural calculation with a civil engineer and, in turnkey services, the municipal permits. Design and permits usually take 1 to 4 months.

5. Construction

It starts with the drainage and the concrete slab, continues with the galvanized steel structure, the envelope and the installations, and ends with the interior and finishes. Depending on size, it takes 5 to 10 months from the slab.

6. Progress tracking

All services include access to the client portal on the website, where we share your project's information.

7. Handover

We walk through the finished home together and hand it over. After the handover we remain available for any questions.

Ready to start? Book your meeting or read the FAQ.

Want to build your steel frame home?

Tell us about your project in an in-person meeting.

Shell or turnkey: which service to choose
What each service includes and when each one makes sense
WhatsApp